Homepage old
[av_layerslider id=’3′]
[av_layerslider id=’5′]
[av_one_third first]
[av_heading tag=’h3′ padding=’20’ heading=’TIER III National Data Center‘ color=’custom-color-heading’ style=’blockquote modern-quote modern-centered’ custom_font=’#222222′ size=” subheading_active=” subheading_size=’15’ custom_class=”][/av_heading]
[av_image src=’http://spectrum-bd.com/assets/uploads/2014/09/resize-data-center-images.jpeg’ attachment=’490′ attachment_size=’full’ align=’center’ animation=’pop-up’ link=” target=” styling=” caption=” font_size=” appearance=”][/av_image]
[av_textblock]
- Tier-III Certification of Design Documents
- Tier-III Certification of Constructed Facilities
- Development of Active Network Infrastructure
- Development of 3MW Power Substation
- Development of 2880 KW UPS
- Development of 1500KW Cooling System
[/av_textblock]
[/av_one_third]
[av_one_third]
[av_heading tag=’h3′ padding=’10’ heading=’ Smart City Applications‘ color=’custom-color-heading’ style=’blockquote modern-quote modern-centered’ custom_font=’#222222′ size=’20’ subheading_active=” subheading_size=’15’ custom_class=”][/av_heading]
[av_image src=’http://spectrum-bd.com/assets/uploads/2014/09/resize-blog-smart-city.png’ attachment=’491′ attachment_size=’full’ align=’center’ animation=’pop-up’ link=” target=” styling=” caption=” font_size=” appearance=”][/av_image]
[av_textblock]
- Connect Corporation, People, and Management
- Unify operational information.
- Real-time data visualization
- Smart revenue forecast
- Connect multiple departments.
- Project Management Dashboard
Read More
[/av_textblock]
[/av_one_third]
[av_one_third]
[av_heading tag=’h3′ padding=’10’ heading=’Robi Rollout Controller (RoC)’ color=” style=” custom_font=” size=” subheading_active=” subheading_size=’15’ custom_class=”][/av_heading]
[av_image src=’http://spectrum-bd.com/assets/uploads/2014/09/resize-roc0DoT_signal_.jpg’ attachment=’492′ attachment_size=’full’ align=’center’ animation=’pop-up’ link=” target=” styling=” caption=” font_size=” appearance=”][/av_image]
[av_textblock]
- ROC manages different 25+ BTS rollouts
- ROC reports tracking of end-to-end milestone
- Multiple Integration with secured gateway
- Mobile-based real-time tracking and input
- Reduce workload at least 30%.
- 200+ Management reports
[/av_textblock]
[/av_one_third]
[av_one_third first]
[av_heading tag=’h3′ padding=’20’ heading=’ IIG Equipment and DC-DR‘ color=’custom-color-heading’ style=’blockquote modern-quote modern-centered’ custom_font=’#000000′ size=” subheading_active=” subheading_size=’15’ custom_class=”][/av_heading]
[av_image src=’http://spectrum-bd.com/assets/uploads/2014/09/resize-dc-dr.jpg’ attachment=’493′ attachment_size=’full’ align=’center’ animation=’pop-up’ link=” target=” styling=” caption=” font_size=” appearance=”][/av_image]
[av_textblock]
- Architectural, Electrical, Mechanical, security Infrastructure.
- Core Network Infrastructure Development for IIG.
- Server System Development for IIG
- Storage and Virtualization for IIG
- Deep packet inspection and Lawful Interception
- Network Monitoring System Development for IIG
[/av_textblock]
[/av_one_third]
[av_one_third]
[av_heading tag=’h3′ padding=’20’ heading=’Research Education Network‘ color=’custom-color-heading’ style=’blockquote modern-quote modern-centered’ custom_font=’#222222′ size=” subheading_active=” subheading_size=’15’ custom_class=”][/av_heading]
[av_image src=’http://spectrum-bd.com/assets/uploads/2014/09/resize-bd-ren-iStock-960462356-network-switch.jpg’ attachment=’494′ attachment_size=’full’ align=’center’ animation=’pop-up’ link=” target=” styling=” caption=” font_size=” appearance=”][/av_image]
[av_textblock]
- DC at UGC site & DR at BUET site
- 54 channels & 34 DWDM Node in Transmission network.
- 14 Distribution Router site in Data network (Pop).
- 92 Edge Router site in Data network.
- Unified communication (UC).
- Maintenance Services of BdREN Network
[/av_textblock]
[/av_one_third]
[av_one_third]
[av_heading tag=’h3′ padding=’20’ heading=’Central Bank Reporting‘ color=’custom-color-heading’ style=’blockquote modern-quote’ custom_font=’#222222′ size=” subheading_active=” subheading_size=’15’ custom_class=”][/av_heading]
[av_image src=’http://spectrum-bd.com/assets/uploads/2014/09/resize-CBRM-Credit-report-vs-credit-score.jpg’ attachment=’499′ attachment_size=’full’ align=’center’ animation=’pop-up’ link=” target=” styling=” caption=” font_size=” appearance=”][/av_image]
[av_textblock]
- Track and report the loan
- Supports 100 + different dynamic reporting to Central Bank.
- Online / Offline integratio.
- Implemented in Major Banks
- CIB, SBS, CL, TP system integration.
- Security Management system.
- Re-payment from consumer
[/av_textblock]
[/av_one_third]
[av_hr class=’default’ height=’50’ shadow=’no-shadow’ position=’center’]
[av_heading tag=’h3′ padding=’10’ heading=’Our history of clients are our inspiration to innovate and sustain growth.‘ color=’custom-color-heading’ style=’blockquote modern-quote modern-centered’ custom_font=’#2a2a2a’ size=’20’ subheading_active=” subheading_size=’15’ custom_class=”][/av_heading]
[av_hr class=’default’ height=’50’ shadow=’no-shadow’ position=’center’]
[av_content_slider heading=” columns=’4′ animation=’fade’ navigation=’no’ autoplay=’true’ interval=’3′]
[av_content_slide title=’Chittagong City Corporation’ link=” linktarget=”]
The proposed solution will be time savings for reporting for the department to spend time for creating reports in excel or other spreadsheet programs.
[/av_content_slide]
[av_content_slide title=’Roads and Highways’ link=” linktarget=”]
Bidder’s Database Management System (BDMS) is a central database system containing information and relevant documents of bidding of individual tenderers
[/av_content_slide]
[av_content_slide title=’University Grants Commission (UCG) of Bangladesh’ link=” linktarget=”]
HEMIS is a web-based educational MIS application to capture data from public and private universities of Bangladesh to generate various analytical reports.
[/av_content_slide]
[av_content_slide title=’Office of Auditor General Nepal (OAGN)’ link=” linktarget=”]
NAMS assists OAGN to efficiently and effectively manage databases of entities, risk assessment, audit planning, execution and reporting etc., and overall monitoring of audit.
[/av_content_slide]
[av_content_slide title=’Robi Axiata Limited, Bangladesh’ link=” linktarget=”]
Rollout Controller and Base Station Tracking System (ROC) manages the business processes by defining workflows for various rollouts such as BTS rollout, transmission rollout etc.
[/av_content_slide]
[av_content_slide title=’Standard Chartered Bank’ link=” linktarget=”]
CBRM facilitates data files upload of different formats and can parse and process millions of records within few seconds. The system has 200+ reports
[/av_content_slide]
[av_content_slide title=’Bangladesh Research and Education Network (BdREN)’ link=” linktarget=”]
SECL designed and implemented full data center and disaster recovery center for BdREN, which included implementation Cisco DWDM, router, Switches in 34 universities.
[/av_content_slide]
[av_content_slide title=’Bangladesh Computer Council’ link=” linktarget=”]
Spectrum designed and implemented full data center for this BCC , which included implementation of raised floor, Online UPS system and generator, Fire detection and suppression, Insulation, Grounding, etc.
[/av_content_slide]
[/av_content_slider]